I have 2 jobs.I want to ru job B if job A has run 3
times.How can I achieve this through datastage
Answer Posted / phani kumar
Hi Friend, by using sequencer, we can run this scenario. Put
the first job A in loop for 3 times. After successful
completion of 3 runs, then, run the second job B.
Pls correct me, if i am wrong.
| Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
How will you load you daily/monthly jobs datas in to Fact and Dimension table using datastage.
How to read the length of word in unix?
What is the method of removing duplicates, without the remove duplicate stage?
How can you write parallel routines in datastage PX?
Difference between ‘validated ok’ and ‘compiled’ in data stage?
What are the stages in datastage?
how to run a sequential file stage in parallel if the stage is used on the TARGET side
What is the purpose of interprocessor stage in server jobs?
What is a datastage job?
Nls stands for what in datastage?
How do y read Sequential file from job control?
What are some prerequisites for datastage?
How and where you used hash file?
Hi, what is use of Macros,functions and Routines..? At what situation you are used. If you know the answer please explain it. Thanks.
Explain connectivity between datastage with datasources?