Answer Posted / sathishkumar
battery backup calculations
Assumption battery bank cumulative voltage is equal to load
voltage
Q=1.25*total load current/i.e 0.8)
where the q=total capacity of the Battery Bank in Amp.hour.
and 0.8 is Battery efficiency coefficient for Lead Acid
batteries.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is settable hystersis protection? If any body knows plz kindly post the answer..
How can find thermal state value in relay for calculate thermal overload.
what are the advantages and disadvantages of speed control of 3 phase induction motor by varying frequency explain with drawing
I am having a 42KW 3 phase electrical heating furnace, heating element is 80/20 nichrome material, my connections is made in such a way that 2 star connection compromising 2 coils per phase so totally 12 coils, shall if i use it unbalanced star condition (instead of 2 group of 3 phase or 1 group of 3 phase, connecting 4 phases of 5 phases) what will be the consequences and is it acceptable?
what is sevice settings for mccb?How can be it setted?
at which voltage level arcing ground is occurs ??????????
Why use in ht motore
How should i design a 1ph & 3 ph transformer. Kindly let meknow all steps and formulaes related to design from scratch.
what questions are asked in the interview for the post of an electrical maintenance engineer in FMCG companies?
How to discuss the phase shift of transformer considering open delta?
What is lifting power for 1 wb/m2 and 1 A magnet?
at what base you will tell the direction of rotation of dc motors and generators?
WHY BLADE & JOW OF ISOLETOR IN SUBSTATION?
battery capacity use of made?
What is the difference between a verilog task and a verilog function?