What is the number of zeros of the product of the first 100
numbers ?
Answer Posted / rashmi
The product of the first 100 numbers is
933262154439441000000000000000000000000000000000000000000000
000000000000000000000000000000000000000000000000000000000000
00000000000000000000000000000000000000.
so the number of zeros of the product of the first 100
numbers is 143.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
g[0]=1,g[1]=-1,g[n]=2*g[n-1]-3*g[n-2] then calculate g[4]= ?
Bactria double every 3 mins. It is N in 1 hour, when was it N/4?
the sum of the present ages of a father and his son is 60 years. Six years ago, father's age was five times the age of the son. After 6 years, son's age will be?
Hansie made the following amounts in seven games of cricket in India: Rs.10, Rs.15, Rs.21, Rs.12, Rs.18, Rs.19 and Rs.17(all figures in crores of course).Find his average earnings.
If A is travelling at 72 km per hour on a highway. B is travelling at a speed of 25 meters per second on a highway. What is the difference in their speeds in m/sec.
WHAT IS THE NUMBER OF ZEROS AT THE END OF THE PRODUCT OF THE NUMBERS FROM 1 TO 100
A car has run 10000 miles using 5 tyres interchangably,To have a equal wornout by all tyres how many miles each tyre should have run. answer 4000 miles/tyre
A ridge formed over Pacific Ocean was because of the intersection of two volcanoes. But in history it was written that it was not due to those volcanoes. It proves a contradictory to form the view that history will be proved wrong in the future.Inference?
Hansie made the following amounts in seven games of cricket in India: Rs.10, Rs.15, Rs.21, Rs.12, Rs.18, and Rs.17(all figures in crores of course). Find his average earnings.
What are all the java technical questions?
what is the sum of 7 consecutive odd numbers with 27 as the fourth number
if A = D, B=E, C=F, VWDUW = ?
they asked the temperature problem.it was same as previous papers.the ratio was -t*t/6+4t+12.
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
There are three trucks A, B, C. A loads 10 kg/min. B loads 13 1/3 kg/min. C unloads 5 kg/min. If three simultaneously works then what is the time taken to load 2.4 tones?