Answer Posted / k.amirthalingam
Formwork is the temporary wooden works or steel works which
will hold the concrete when it is freshly poured. The
formwork material will be of plywood,steel sheet, normal
18mm thick wood. We say in Civil engineering as Shuttering
works.
By
Amirthalingam
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
satart to end steps by step process of building construction...? i want to planning theme accuretly
what is the hanekom repairing material after concreting work
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
What are the skills required to become an architect?
Forces in a Shear Wall are in plane or out of plane ?
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
rate analysis hiring of generator 62.5 KVA
What is GSB gradation
How much cement,sand,bricks and water needed for 1square metre brick work?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
how can we calculate steel value, depending on load
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
what will happen if one could not properly follow the spacing of slab reinforcement bar?
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.