Answer Posted / k.amirthalingam
Formwork is the temporary wooden works or steel works which
will hold the concrete when it is freshly poured. The
formwork material will be of plywood,steel sheet, normal
18mm thick wood. We say in Civil engineering as Shuttering
works.
By
Amirthalingam
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
what is the composition of good brick ?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
What is absolute pressure? How absolute pressure is calculated?
what is the weight of 12mm aggregates?
what is the Asfalt test?in road constraction..?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Does brick grows bigger every year?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
which has high compressive strength between hollow block and brick masonry?
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
afe or not
Name the main components of a cad gui?
What are the causes of building collapse?
from where ican get sample papers for CET-delhi 2012