Answer Posted / k.amirthalingam
Formwork is the temporary wooden works or steel works which
will hold the concrete when it is freshly poured. The
formwork material will be of plywood,steel sheet, normal
18mm thick wood. We say in Civil engineering as Shuttering
works.
By
Amirthalingam
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
How many feet are in 4 square yards?
how to calculate rate analysys of 1:6 plastering 10 sq m
why does the most of civil engg is not intersted to going for teaching field?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
Define What are the uses of alloys in daily life and how are alloys made?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
What are the uses of alloys in daily life and how are alloys made?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
How to calculate steel for beam slab and column
What are the basic use of runners and standards of pipelines?
The portion of a brick cut across the width is called?