what is the minimum compressive strength in 7 days for
m20,m25,m30

Answer Posted / ilavarasan.g

70%

Is This Answer Correct ?    7 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to arrive d*d/162 , for finding the kg per meter , wt of steel

1413


what is the specific gravity of rubble in plum concert

984


Is it possible to make a feature using an overdefined sketch?

770


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

3542


What is Base Shear ?

681






Which is stronger solid steel rod or hollow steel pipe?

835


in one SQM plaster how much Cement and sand consumed in ratio 1:4

1681


What is the compressive strength of fly ash bricks?

705


i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard

1880


to draw bm diagrams for portal frames under different loadings//

2454


why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..

2091


what are the changes in concrete pour height as per IS 456, 2009?

2715


how much need sand and cement for 1 cft roof construction?

3975


What are the reasons for geotechnical site investigations in uganda?

661


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2625