Answer Posted / hiral prajapati
the s/s require din electrical system b'coz do not use
generat power direct utilizing it bulk power genret in
generation system.so utiliztion power are step down by
substation.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How 48-relay (incomplete sequence) functions?
How to check the cable fault / hv test of transformer cable.
PLEASE INFORM ABOUT THE IDEAL TEST RESULTS OF MAGNETIC BALANCE TEST OF TRANSFORMER 33/11 kv DELTA-STAR T/F
is it possible to say motor horsepower number without seeing name plate(when name plate damaged)
Explain in details how you would react to an unexpected incident when your supervisor or manager is not around to give instructions?
why we get 2 differnet values for power factor in 2 watt meter method in 3 phase
What is nyquist contour?
In vapour absorption refrigeration machine fluids used are
can u please mail me the syllabus for GET exam for damodar valley corporation?
can we choose current transformer secondary, to calculate residual flux in a power transformer, so as its saturation is close to the saturation level of power transformer?
Match the following a)(X'+Y') b)X'Y' C)XY 1)NAND 2)NOR 3)Carry
how can calculate 1kva generator running time in 1 liter keroscene
WHAT IS MEANT BY TV TERMINAL IN 500MVA TRANSFORMER?
What should be the voltage between Neutral and Ground in secondary side of the step down transformer (230 V to 110 V) with no load condition?
ELECTRICAL ENGINEER TEST IN FEWA ANY ONE HAVE KNOWLEDGE ABOUT THIS?????????