what is Entry and Exit criteria explain in detail?

Answer Posted / ramprasad.s

HI

Entry : Modules & Functions.

Exit : High severe Bugs had been closed.



sun_ramprasad@yahoo.com

Is This Answer Correct ?    6 Yes 26 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Zenq interview questions for manual testing

1411


Hello. I am not here to answer your question. I jus found a job as software QA engr. And i am totally new to software testing. So can someone pls help me in the following scenario? there is this registration screen, and it contain: One textbox called Nickname which only accept alphanumerical One textbox called Contact which only accept numerical, One textbox called Email which can be filled with alphanumerical and symbol and One button called Register now becos there is so many textboxes, where i can filled with alphabet, number, symbol, "just space", leading zeros, leading space. there will be lots of combination. can someone pls help.. i will be appreciated if u can post the test case of the scenario i mentioned. Lots of Thanks

1806


How we allocate the priority(Blocker, Critical, etc.,) in Testing?

1304


How to test an application if it was already developed and it is in the state of changing the functionality according to the customer requirement How to start testing in this situation. I got an application to test.It is a desktop application.It is still developing and started 8 months back.how can i start to test this application? Is it the right way to test it in "Random testing"? or writing the testcases from page one and executing them.i have an another responsibility that is I have to automate that application. can anyone tell me what is the process to test this application.

1555


What is the main use of preparing traceability matrix and explain the real time usage?

745






Diffrernce between client server testing and web server testing.

1742


Hi to all..Now am working at one company as Software tester..I have selected for Accenture via one consultancy.. They have told that joining date will be on 19 th july..But now they are postponed joining date..whether i can trust that or not?Can u plz tell??plzz..whether i can put my paper to releive or not? CAn u telll?

1623


What is positive and negative testing?

675


types of reviews?Advantages of reviews? Diff between process and procedure? diff b/w verification and validation? diff b/w cmm,cmmi? exp tqm,gqm,iso,ieee? Roles and responsibilities of tester? Ricks,types of ricks? what r Quality factors?

1732


There is an opening in our organization Sierra Atlantic, Hyderabad. All Manual test engineers with 2-3 years of experience can forward your resumes to mah_cs82@yahoo.com before May 01, 2008. (Only manual testers) with a covering letter, current CTC and Expected CTC.

1660


Why do you need to parameterize fields in your virtual user script?

1662


What is an audit report? Whom is it done by?

1967


What is the difference between a bug, a defect and an error?

688


can anyone help me in getting unix on manual testing i.e can u forward material & web sites to my mail id (suresh_57599@yahoo.com) to understand how the work flow working on manual testing on unix and the contents.plzzzzzzzz help me its urgent.

1422


What are drawbacks in system development life cycle

1720