component parts of a weir

Answer Posted / mallikarjun b

1)crest gate
2)launching apron or talus
3)u/s and d/s cutoff
4)block protection
5)inverted filter

Is This Answer Correct ?    10 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is pile and deam foundation

2016


What is an ortho mode?

892


resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil

2391


How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site

1423


To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?

1713






What difference comes in constructing of house and a housing complex like society

1622


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

1871


What goals do you have in your career?

1852


what is the difference between np2 and np3 concrete mix

1709


Test procedure of fly ash bricks as per code ?

2281


Material calculation of cm 1:6 for 1sqm

1706


Explain what is change order request?

873


RR masonry rate analysis

2969


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1413


Different sizes of Hollow blocks and its weight. Thanks.

2144