Answer Posted / ketan_k
1.cost saving
2. additiaon of fine prticle in concrete ,
3. to reduse heat of hydration
4. prolongation of setting time of concrete
| Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
what is project?
What is passive earth pressure ?
Which ratio use for cement selery???
What is the difference between a wood shake and wood shingles?
what is tension & compression of steel bending.
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
Prepare a Schedule for a Highrised building from starting stage to Handover?
Does brick grows bigger every year?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
How to do bbs in excel format
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
a butt weld is specified by
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter