What is vector group? What is meant by DYN11?Why is it needed?
Answer Posted / t eswara rao
Clarification for shraddha:
11o clock means primari voltage vectors leading 30deg
with reference to secondary voltage vectors.OR secondary
voltage vectors lagging 30deg with reference to primary
voltage vectors.
As in a clock at 11o clock big needle leads small
needle by 30deg OR small needle lags big needle by 30deg
| Is This Answer Correct ? | 5 Yes | 12 No |
Post New Answer View All Answers
where is the need for short circuit test for 3 see is required and why? can you explain in brief with application
what is consequences of neutral and earth connect?
In the ACB breaker capacity is 2000Amp but this each phase taken 1250 But total beldibg load is 600amp or 700amp watt is the problem
how to protect motor in dol starter having capacity of 30 hp.40 hp?
How REF protects transformer alone? explain with diagram.
PIU how does work?
How To increase Knowledge Of boliler regarding To Only Electrical Field..
delta motor winding resistance I take normally single winding is 2.5, which value is came delta connection ie RY ?
Where burned of electricity,when,who, & why.
Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!
What Is HO factor in power selection
bus bar design conditions and sizing pls tell me quickly
impliment (AB)`+C to transistor representation
Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18
How many VSC based HVDC are there in India and the world