Answer Posted / dilanka
motor drowse starting current which will be around 2-3 times
the rated current. so cable size going to be increase.How
ever it is suitable to select 125% or 130% current rate for
cable because the cable can withstand without any damage for
few second. you must check the cable manufacturing data to
find this specific time and it should be more than the
starting time period of the motor.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
if main CT is of ratio 50/5, and meter CT is -/5 what will be overall multiplying factor of meter.PT is 11000/110 .
plz send me the syllabus or any sample paper for engineer trainee recruitment if any,on ravinder911@yahoo.com
why the rotor current becomes in steady state during high slip region? please verify with equations.
What are high pass filter and low pass filter? and What are the flowmeter ?
After completing iti in electrician, how can i get certificate of electrical supervisor? What ia requirements. For it?
Form S and "c" license application both are same? @ tneb portal
what is metering cum synchronizing panel and how it is used?
How earthing of switchgear system to be done.
what is the importance of Partial Dischage test for Electrical Equipments
what is mppt (maximum power point tracking ) and how they used in solar power generation ??? what are the main components used in mppt?????
which stabilizer is better ? AVR, Servo Stabilizer, Static stabilizer etc & why explain it
why surge protectetor work explain with the help of circut diagram?
why we can use 1 to 5V dc
what are the sample questions asking to the test cunducting for electrical superwising lisence test?
what are the specifications we must look at to select a relay for any capacity motor?