what is diff. between CMMI and CMM levels?

Answer Posted / jaiswal pavan

answer given by the first person for above mentioned
question is right.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can we use agil/scrum methodology in prodcut testing.

1546


What is infeasible path?

633


How the 2 wings and body of the butterfly model of test development is represented?

598


What is issues?

553


Explain cause-effect graphing?

546






Which is not a tool of static code analysis? a.)Ada b.)Borland-delphi c.)Fortan d.)None

2012


The Following Characterstics posses some XYZ company. * Uses formal standards and policies * Conducts software inspections * Has advanced configuration management and change control * Uses CASE tools * Has a software engineering process group * Gathers metrics on process and quality * Requires that developers have formal software engineering training * Practices continued process improvement Based on aboue , Tell me which CMM Level is the company..? 1. Level 1 - Initial 2. Level 2 - Repeatable 3. Level 3 - Defined 4. Level 4 - Managed 5. Level 5 - Optimizing

1685


What is top-down strategy?

515


What is the difference between test matrix and traceability matrix?

588


What is high order tests?

620


what is cohensive testing and span control?

1981


What is the objective of regression testing?

600


What is difference between JBOD and RAID?

1662


what kind of test cases will you suggest for an atm machine

618


how to attach and detach databases in sql?

1543