Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Defination of civil engineering

Answer Posted / arpan jain

civil engg is a person who finds quick alternative to any
situtation that would increase or enhance the stability of
that structure and also that idea is economical.

Is This Answer Correct ?    2 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to arrive dry volume of concrete (1.52 to 1.57) ?

2338


What is different between DI Pipe and CI pipe?

2138


What is the density of DLC & PQC and how it is differ from normal concrete?

3726


How do you change a dimension value in solidsworks?

1227


What is the likely strength of a 1:2:4 concrete mix?

1085


On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??

3290


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?

6746


What is the basic difference between OPC

2046


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2148


How many square meter can mason layout chb per hour

2254


 What is difference between limit state and working stress method? How it is applies in building structure.

2314


Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used

4844


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

3036


I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'

2494


what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?

2287