What's the expanded form for NMR?
Answer Posted / d s shatish
Non Muster Roll (The Temporary Labors appointed for a
particular Job)
| Is This Answer Correct ? | 18 Yes | 6 No |
Post New Answer View All Answers
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
density of crush sand & crush stone or grit powder
What are the advantages and disadvantages of lead products in construction?
What is command line?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
what is w/c ratio in dry lean concrete for m10 mix design
Permissible wastage of cement as per IS code ? In which IS code I get it?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
What are the advantages of building a dam on the river nile?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
detailed calculation of the amount of cement used?
what is the effect of duration of earth quake on framed structures ?
Define absolute co-ordinates?