area of triangle=1/2*b*h base incresed by 4 times & height
is devided by 2, the net effect of area
Answer Posted / kdrocks123
bh
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
All birds are animals. All animals are four legged. Implications a. All animals which are four legged are birds. b. All birds are four legged c. Some birds are four legged d. Some birds are animals but not four legged.
15 lit of water containing 20 % of alcohol ,then added 5 lit of water .What is the % of alcohol?
ram singh goes to his office in the city, every day from his suburbun house. his driver mangaram drops him at the railway station in the morning and picks him up in the evening. Every evening ram singh reaches the station at 5 o'clock. mangaram also reaches at the same time. one day ramsingh started early from his office and came to the station at 4 o'clock. not wanting to wait for the car he starts walking home. Mangaram starts at normal time, picks him up on the way and takes him back house, half an hour early. how much time did ram singh walk.
What was the aggregate of marks obtained by sajal in all the six subjects?
what is the angle between two hands of a clock when time is 8-30
Initially two cups of same volume are present with milk filled upto 3/5th and 4/5th of their volumes.Water is then filled. Then two mixtures are mixed. Find the ratio of water to milk in the mixture.
It takes five minutes to pass a rumor from one person to two other persons. The tree of rumor continues. Find how many minutes does it take spread the rumor to 768 persons.
In a journey of 15 miles two third distance was travelled with 40 mph and remaining with 60 mph.How much time the journey takes...
electrical question in diploma level
One ship goes along the stream direction 28 km and in opposite direction 13 km in 5 hrs for each direction.What is the velocity of stream? `
During a given week A programmer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.
If it takes 10 technicians working 6 hours to build a server. They start woring at 11 AM and 1 technician is added per hour starting at 5 PM. At what time they will finish the server?
complete the series: x y z u v w r s t __
albert and fernandes they have two leg swimming race. both start from opposite and of the pool. On the first leg, the boys pass each other at 18 mt from the deep end of the pool. during the II leg they pass at 10 mt from the shallow end of the pool. Both go at const speed. but one of them is faster. each boy rests for 4 sec to see at the end of the i leg. what is the length of the pool.
A storm will move with a velocity of towords the center in hours. At the same rate how much far will it move in hrs.