Answer Posted / anitha
hai present im anchor but i love cinema. give me 1 chance
ill prove my telent my number 9966888948
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
Mention different types of roof systems?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
How can you distinguish between sorption, absorption and adsorption?
what is w/c ratio in dry lean concrete for m10 mix design
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
what does the track parameter mean in staad.pro?
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
how to control PQI (Project Quality Index)
Why the statue of liberty is made of copper?
what is difference between GTS bench mark and temporary bench mark
What Reinforcements Are Used In The Process Of Prestressing?
How to calculate brick work quantity?? Block work quantity??
explain the rale of the government in the construction industry