Ac means Alternating current which is changing always with respect to time. .D.C means Direct currentwhich is not changing always with respect to time.
A/c having many losses like corona, ferranti effect during transmission. .In A/c transmission cost is high bcoz it emoploys with large trfrs. D.c is better for low loss transmission. . .In D.c there no P.F. also
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What are the types of piano switches?
How can find thermal state value in relay for calculate thermal overload.
HOW TO CALCULATE ELECTRICAL, MECHANICAL,& OVERALL EFICIENCY OF GAS ENGINE POWER PLANT
what is the disadvantages of common earthing for AC and DC equipment? (i am talking about inverter control room and inverter duty transformer earthing is common...?)
In EDO ACBs what is a purpose of closing coil and motor, what is the operation of these devices are they inetconnected. means if we give supply to motor and by BCS we charge Closing coil,what exact is operation is and how it charge a spring of ACB. Sir if anybody has an wiring diagram please send me the link to operate and EDO breaker.
How to calculate no of Lighning arrestors are required for protecting 50mX 50m*20m cubical building and locations of LA?
how i chosse capacitor bank if my energy meter is 48 kvr? tell me capacitor bank chossen formula?
Explain what are inter-poles and why they are required in a dc machine.
what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero
I am a possesor of c licence from 1993. I forgot to renew during the year 1998. During that time I was working at TNEB to till date. Is there any possibility to get renewed? or to apply for a new one?
If i have two 3000 kW motors and the whole facility requires a 10 MVA transformer. What would be better installing two 5 MVA transformers(one for 1 motor ) or just a single 10 MVA transformer for both of them. Give reasons for your answer.
please anybody help me to find out the BHEL trainee Exam previous year questions papers . if u ve pls. send it to surekhared@gmail.com
How we calculat the NGR of 3phase Generator, Our generation voltage 11KV
how to design step down 12 V, 1mA small transformer from 220 V AC? Because according to VI relation and power transfer it results bulky...
what are your career plans upon completion of the programme and the relevance of recity generation to your professional development?