I had a plot of say 5000 sq.ft. and soil in the plot is
normal soil. Now I had to work upon the tender quantities
to prepare a preliminary budget within a day. Is there any
thumb rule or assumptions to calculate the quantities which
can differ upto 15% +/-?
Answer Posted / pravinkumar borling
to calculate for preliminary budget,it can calucated by
multiplying built-up area into rate per sq.ft as per
today's market rate it cambe taken rs.1200 per sq.ft
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
I need old MMUP exam question and answer for Civil engineering
How is make concrete cube?
Will going from a 3-tap to 6-tap increase water pressure?
about higyway engineering
residential projects,structural.
What is meaning of FREE STANDING STAIRCASE ?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
Formula for calculation volume of essentric footing
What is the tallest man made structure in the world?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
400 ku d/c clearess ketan hota hai?
Explain the latest method to detect a crack in a building?
what is the meaning of 40/20 src
what r you reqired for concrete baching plant?