what are the costing parameter ?

Answer Posted / shib shaw

I/P & O/P Plan Cycle .
Work center : Activity types and the formulaes,cost center
Routing : Activity Price Calculation .
BoM: which is the contributor of standard material cost
against the Product in Production order.
Cost Centre: Production Cost Center mapped in Work center .
Indirect Cost Center the value of CC which is Updated in
Product through Assessment Cycle .
which is contributor unplanned materialissues against the
product.

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How does sap know that an operation has components as indicated by the component allocation indicator?

557


What is internal payroll process?

618


What is the use of stock requirement list?

651


What is planning horizon?

632


SPRO path for order, confirmation or requirement class.

2245






What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?

746


In implementation stage tell some standard scenario before AS-Is & TO-BE

1390


What is Individual and collective requirements and differecne between them in MTO scenario?

1591


What happens to planned after it has been converted into production order ?

639


Explain In-process inspection.

1019


Explain the lsmw and the steps involved in them.

558


How is the processing time calculated in a wc when both labor, machine categories exist?

667


Standard mrp steps

1409


You want to insert an inspection check point at the end of an operation. How would you do that?

633


What is 'capacity planning'?

556