why are you interested in joining in core company instead
of joing in software company
Answer Posted / chandran
basically i am ece student i like core company why mean
i have lot of intrest in electronics project and circuit
design so that only i choose core company
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is the difference between electrical and electronic choke?
Tell me about ur past electrical maintanence job
How to distinguish whether MCB is DC or AC looking at it physically
i have completed deee and i've (June2012-feb 2015 experience in electrical maintenance in pvt ltd company.company having HT & LT electrical power.how to apply electrical C-license ,NOW I was resigned my job,what are requirements of applying for c-license
How to select cable the size, what is the parameters use and what is the formulas use for this cable size calculation?
i have some screw comprressor with 630kw power,i have established them with simple star to delta circuit,by the way there is so much inertia when the screw comprressors start, can you offer me contactors power with 400vac or any cataluge to choose the contactors
What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.
How should i design a 1ph & 3 ph transformer. Kindly let meknow all steps and formulaes related to design from scratch.
Why current shoots up in the secondary on the knee point voltage during saturation test of CT? How core saturation effects the secondary current (while the primary side is open)? What the logic behind this?
solar inverters was not connected to the nuteral link .this nutwral possible to any other systems
what is meant by twilight switches 7 where its applicable ?
What is the ratio of Booster transformer?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
we are having 110 Kv,250mA Electrostatic precipitators for coal fired boilers. what will be static voltage and current after discharge and what time it will remain before earthing?
how to prepare the technical test