Answer Posted / mithun kar
C-construction,I-is,V-very,I-important,(for Human)L-life.
That's the real meaning of CIVIL.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Define What is an ice dam sock?
what are RIB slabs explain about it
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
Which is stronger solid steel rod or hollow steel pipe?
what is hydrostatic paradox?
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
how to caliculate required amount of cement and sand required for 1cu.m.
How to calculate the load of partion in flat slab if we use brick?