Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / s.kumar
Volume of Trapezoidal footing= h/2(a+b)*l
where,
h= depth of footing
a= top width of footing
b= bottom with of footing
l= length of footing
In Case of Frustrum of Pyramid
V= h/3(A1+A2+Square root of A1*A2)
Where,
A1= Area of top section (a*b)
A2= Area of Bottom Section (A*B)
| Is This Answer Correct ? | 58 Yes | 21 No |
Post New Answer View All Answers
hi guys what happens if you are absent for a supplymentry exam?
Define What are the materials used in building a gravity dam?
List out some of the common problems that architect have to tackle it?
Please let me know what is the simplest way of Calculating Mix Designs
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
What are the reasons for geotechnical site investigations in uganda?
what is idealized curve for concrere and steel
What is the absolute pressure scale?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
All aptitude question of Bechtel
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
what r the precaution for high in atp tempareture,low in atp tempareture
How to plan a project
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.