I had a plot of say 5000 sq.ft. and soil in the plot is
normal soil. Now I had to work upon the tender quantities
to prepare a preliminary budget within a day. Is there any
thumb rule or assumptions to calculate the quantities which
can differ upto 15% +/-?
Answer Posted / n.c.pathan.
Estimation can be done in a day. It will require a plan.
However if you are interested in the cost of the structure
it will cost you approximately Rs.1250 per square feet with
normal specifications.
| Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
how to calculate spacing rod in column
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
is concealed wiring a problem in fly ash brick wall?
What is meant by Crystal Concrete?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
What is chemical composion test
difference between trapezoidal and pedestal footing and how the load acts on that
how i can tak Quantity of mortar in block work
How did street originate in the plumbing term street ell?
how much cement sand n bricks required in im3?and how much in plaster?
For Wet Mix Mecadam design what is Optimum moisture content
What are the alternate material for steel, Sand and aggregate
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
what is the use of water bar in water tank and is this an extra item in estimate?