I had a plot of say 5000 sq.ft. and soil in the plot is
normal soil. Now I had to work upon the tender quantities
to prepare a preliminary budget within a day. Is there any
thumb rule or assumptions to calculate the quantities which
can differ upto 15% +/-?
Answer Posted / n.c.pathan.
Estimation can be done in a day. It will require a plan.
However if you are interested in the cost of the structure
it will cost you approximately Rs.1250 per square feet with
normal specifications.
| Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
on what basis the partial factor of safety are decided? form the load combinations
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
Wats the formula of eccentric footing and how was calculated from concrete qty
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
what are the code used for residental building?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
HOw much % of premium on DSR-2013 currently
What is command line?
Which is the direction of negative angle?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
What is the cost difference between site mix and ready mix concrete per cubic meter
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2