Answer Posted / anju mishra
Quality Control involves independant testing and validation
of the end product before it is dispatched to the
customer.After the testing of the product has been
completed by the testing team , an independant tester from
the quality team will perform random testing on the product.
This testing is done inorder to confirm that the product
meets the customer requirements.
After Quality Control testing the product is certified by
the Quality Head, assuring the customer that the end
product meets the requirements and also that the end
product adheres to the Quality Standards of the
organization.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the types of testing can be performed on facebook login page?
How do you deal with environments that are hostile to quality change efforts?
In one project, How much “%” effort made by SQA Tester? e.g. : developer = 35%, manager = 10%, etc.
List out the roles of quality assurance engineer?
How do you decide you have tested enough?
What are verification and validation and difference between these two?
What is the difference between Outsourced Testing and Crowdsourced Testing
What are the tests activities that you want to automate in a project?
Why is performance testing necessary to be done for any application?
What if there is not enough time for thorough testing?
In case you have any doubts regarding your project, how do you approach?
What is validation and verification in software testing?
What is Operational testing?
What is the role of qa in a project development?
What is a test case template?