Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how we can prevent freshly laid concrete from rain ,, What
the plastering thickness for a) inner brickwork b) outer
brickwork c) beams & slabs

Answer Posted / k.sathiyaraj

to cover the tharpalene sheet over the freshly laid concrete
to prevent the concrete from rain.

normally the maximum plastering thickness for all brick
works and beama& slabs is 12mm.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure

1573


how to calculate the density for high density concrete ? or is it same as the density of RC?

2330


what is civil engineer greatest strength and weakness?

13836


Can we use concrete of slump cone in cube casting in which we have already measured slump?

1703


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2454


what is the calculation of raw material for 0.35cum of m-15

1401


how to create our resume?

2108


Any strength is a stress but any stress is not strength

1735


WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.

1962


 rcc floor to floor  4m. in column reinforcement where we provide lap in exact location.     

2015


specifications of fe500 steel

3477


What is change order request?

1053


How long does it take concrete to harden?

1096


How to calculate chejja reinforcement

2456


Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

1968