IN A DY11 GROUP DISTRIBUTION TRANSFORMER WITH NEUTRAL
EARTHED, WHAT WILL HAPPEN TO THE SYSTEM VOLTAGE & THE
EQUIPMENTS IF EARTH GETS OPEN ON LOAD?
Answer Posted / k.prakashchandra
Nothing, only the earthing of appliances becomes ineffective.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
PAC and simple Ac different
What is the formula for calculating no-load current?
Can anybody tell abt concrete encased earthing or grounding?
How much weight an electrical engine can pull??
How is operate breaker failure scheme in substation
if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.
What is the direction of current flow in ct secondary...means if the current is flowing from P1 to P2 then what will be the direction of current flow in ct secondaryw
CBCT selection
i have 500 amp inductive load of motors ,,,pleas tell me how can i calculate for capacitor bank for improving my power factor to 99 .....calcullations for capacitor bank,,,,
hi can anyone pls tell me the eee interview core questions asked in l&t
Define Electrical Insulation and examples of Solid,Liquid and Gaseous insulating materials?
A 100 kVA , 400 v/250 kv testing transformer has 8% leakage reactance and resistance on 100 KVA base . A cable has to be tested at 500 kv using the above transformer as a resonant transformer at 50 hz . if the charging current of the cable at 500 kv is 0.4 A find the series inductance required . Assume 2% resistance for the inductor to be used and the connecting leads . Neglect dielectric loss of hte cable . what will be the input voltage to the transformer ?
How many types are using in 220kv/400 kv swith yard
Hi, My plant daily consumption is calculated as 3.8MWH but my supplier has sanctioned an power of 2.6MW per day. how can i equal or distinguish this two factors
we have earthmat at 110KV substation.we would like to take earth resistance.b some says that by connecting earth megger terminals (C1,P1) at middile point of earthmat (at riser) will cause voltage gradient at other earthmat nods and dont get exat earth resistance.when connecting at end nods will get exat value . is it correct .please explain