Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How do I calculate the ground is resested for a 5 floor
building?

Answer Posted / jr suthar

By calculating the total load of building and safe bearing
capacity of sub soil, We can find out that the sub soil is
capable to resist the load of 5 story building.

Is This Answer Correct ?    48 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?

1903


How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?

1964


what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon

2755


how much of the strength comes from post-production curing

2279


procedure for preliminary selection of size of column of 5 storey building

3139


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1910


how to stop beam concrete between column

2335


why is the column design?

2194


Describe the sections included in a typical bill of quantities

2221


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

2353


What is absolute pressure? How absolute pressure is calculated?

1070


3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.

2068


Detection of a beam & a girder are––––

2165


how to take concrete quantity for precast segment for viaduct project?

3055


What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet

2496