I am final year b.tech student..i applied for gate but i am
not interested any of my engineering subjects. i am
interested in management wise.. is my option correct after
b.tech..
Answer Posted / akshay gupta
Engineering is better than Management.Management is all
about comon scence.but do in which u r intrested,because u
can do this better than any other work.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Can you please explain creepage distance in detail, for a 6.6kV cable head what must the distance be and how do you determine it?
What will happen if the d.c. Shunt motor opened accidentally running on no-load has its shunt field winding?
What is an Air COmpressor
what is under coal gassification?
WHAT IS DEAD END IN PROTECTION?
How out of step protection relay works?
how to calculate micom relay earth falt time and current sertting
our factory is going under construction mean time transformer 1000 kva 2 nos &load break swithch 12 kv & 4 nos 750 kva 2 nos & 380 kva 2 nos generator to be errcted.how to arrange earth pits &how to earth connect & neutral pit how to calculate in earth bit size.
how to calculate cooling requirement of datacentre from electrical load?
Load transfer in 11kv double busbar switchgear - operation.
If the line voltage is reduced to 75% of its rated value then by what percentage current will reduce ?? 75% 25% 50% no change and why ?
Any Electrical Engineering jobs?Please refer for interviews. Thank you
For the requirement of a furnace of temperature range up to 1200 oC using silicon carbide rods, What is the required rate of transformer needed (please do it with all details)?
oil cooled transformer
a)In a 3-phase 4-wire circuit, a circuit breaker is selected to protect the circuit whose highest fault level is 6.6 MVA. Determine the required minimum breaking capacity in kA. (Note: Covert 3-phase power in terms of kA to find answer.) b)Using the below, determine the required minimum making capacity in kA as a “peak value”. Rate breaking capacity (Icn) ka: Icn<= 1.5 Factor = 1.41 1.5