Concrete Mix designs for M15,M20,M25,M30 and M35
Answer Posted / ibrahim s
Mix design ratio is depending on the trail mixes conducted
to get the particular design strength of concrete in 28
days.It may varry depending on material, weather condition,
batching etc.
| Is This Answer Correct ? | 140 Yes | 23 No |
Post New Answer View All Answers
How to calculate steel for beam slab and column
types of laps in column
For Wet Mix Mecadam design what is Optimum moisture content
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
What is the Roll of Water Bonding under VDF road?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
How to compute minimum number of columns required for a site from area of site?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
what is the most suitable foundation when construct a bird watching tower in a marshy land
Types of column foundation and how to calculate its steel quantity.
how to calculate the strength of rebound hammer test reading in building construction ?
For the construction project what capital cost has to be taken in consideration?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
How can i do RCC rate analysis?
difference between fc and fc'?