How calculate the physical stock of material such as
Fine/Coarse aggregate,sand & stone dust laying at site?
Answer Posted / anwar hussain
Collect the material in conical shape,calculate the radius
(r) by measuring the circumferance & hight(H) & use
following formula:
V=0.333 X 3.14 X r2 X H
Where r2 is square of radius and H is Height of
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
What are the phases inspections are done by local authority while construction?
What is the procedure of concealed plumbing in toilets?
which red: used in roof teping, then use only cement
can you provide a link for manual design of building?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
what is m30 in concrete tiles
Gidc technical que paper
What is meaning of tlc
Which prize is the alternative to the NOVEL Prize?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
Reinforcement details at hinged joint
How do you maintain water pressure?