can we half project in parallel jobs and half project in
server jobs?
Answer Posted / asif
You can have such scenario [preferred not to - unless you
are upgrading].
The communication between parallel jobs and server jobs
needs to be via sequential files.
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What are the different layers in the information server architecture?
i WANTED TO USE THE RANGE LOOKUP SCENARIO IN DATASTAGE 7.5.2 SRVER JOB.i HAVE A DATE FIELD IN SOURCE AND I SHOULD MATCH IT WITH A FIELD IN LOOKUP FILE.BUT,THE FIELDS SHOULD MATCH EVEN THOUGH THERE IS SOME RANGE.CAN SOMEONE TELL ME HOW CAN I DO THAT. THANKS
How to find value from a column in a dataset?
How do you import and export the datastage jobs?
Define Data Stage?
If you want to use a same piece of code in different jobs, how will you achieve this?
Why do we use exception activity in Datastage?
Define Routines and their types?
What is a quality stage in datastage tool?
What are routines in datastage?
What are the some differences between 7.x and 8.x version of datastage?
Explain how a source file is populated?
Notification Activity
explain about citrix scheduling tool in datastage
Define ds designer?