can we half project in parallel jobs and half project in
server jobs?

Answer Posted / asif

You can have such scenario [preferred not to - unless you
are upgrading].

The communication between parallel jobs and server jobs
needs to be via sequential files.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the different layers in the information server architecture?

731


i WANTED TO USE THE RANGE LOOKUP SCENARIO IN DATASTAGE 7.5.2 SRVER JOB.i HAVE A DATE FIELD IN SOURCE AND I SHOULD MATCH IT WITH A FIELD IN LOOKUP FILE.BUT,THE FIELDS SHOULD MATCH EVEN THOUGH THERE IS SOME RANGE.CAN SOMEONE TELL ME HOW CAN I DO THAT. THANKS

3416


How to find value from a column in a dataset?

1847


How do you import and export the datastage jobs?

825


Define Data Stage?

741






If you want to use a same piece of code in different jobs, how will you achieve this?

914


Why do we use exception activity in Datastage?

873


Define Routines and their types?

723


What is a quality stage in datastage tool?

712


What are routines in datastage?

919


What are the some differences between 7.x and 8.x version of datastage?

861


Explain how a source file is populated?

928


Notification Activity

998


explain about citrix scheduling tool in datastage

1911


Define ds designer?

871