Answer Posted / thanigai1984
FAP-fire alaram panel .. it connected as loop consist of smoke detector heat detector ERS-emergency release switch. MCP- manual Call point. FM 200 these are all the fire equipment to indicates and produce alarams
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
I need the recommended size for a 3 phase transformer at 13.8 KV Primary and connected loads of 3000 kVA at 4200 volts and 2375 kVA @ 480 volts AC.
in indoor type circuit breakers why only the corner breaker trips specially during cold season. What is the reason.
What current position are you holding in your current company?
Hi Suppose we have a wye/wye transformer which is grounded at both sides,in this situation, do we have ay ground transformer? in other words, ground transformer can do any thing more (while we have nuetral wire in both sides)? As the last question, what about 3rd harmonic? we have two choices: first using wye/delta transformer + ground transformer and second using wye/wye earthed connection.in the former choice, we dont have 3rd harmoonic at the secondary side but what about Yn/yn conection? do we suffer from 3rd harmonic in the Yn/yn connection?
Can clean earth cable be considered as low current cable
what are the values of VRY,VYB,VBR,Vry,Vyb,Vbr,Vrn,Vyn,Vbn for Magenetic balance test of 100 KVA and 63 KVA Distribution transformer
what will be the maximum winding temperature of 6.6kv HT motor 450kw, Full load current 49A. 50Hz Frequency.
sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company
What is the difference between the transmission line and distribution line?
why are installed water leakage detection system data centers & server rooms
what are the standard IR values should be of R-E, Y-E, B-E, R-Y, Y-B, B-R of VCB in closed condition and in open condition for 500KVA & 1000KVA transformers. and what is the acceptable range when tested by 5000V megger.
For an induction motor wat is the loading/unloading cycle duration or interms of L/UL ratio/ percentage?
How good are you in resolving the commercial issues to Employer's advantage?
how we can adjust for three phase motor cold stall time ,hot stall time and thermal register set up?
what is resver in electrical enginnering with answer