Answer Posted / doli tomar
When a relay is used to switch a large amount of electrical
power through its contacts, it is designated by a special
name: contactor. Contactors typically have multiple
contacts, and those contacts are usually (but not always)
normally-open, so that power to the load is shut off when
the coil is de-energized. Perhaps the most common
industrial use for contactors is the control of electric
motors.
| Is This Answer Correct ? | 67 Yes | 6 No |
Post New Answer View All Answers
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
What willbe change in programming when we use 5/3 solenoid inplace of 5/2 in operating of a cylinder?
What are PLC leader logic program method
what is DRP panels?
how to commissioning the genset with amf panel?
is that a problem if i connect a single phase load to a secondry delta connected transformer but i get a neutral from other transformer i the system?
Either the Armoured Earthing strip of HT 3 core cable have to pass through CB CT or not , why ???
Why slip ring ind. motor power consumption is low compare to induction motor .same 90 kw motor used same load output
How much voltage we need to apply in 33kv cable during hipot test of cable
Is it possible to measure correct value of earth resistance & cable insulation ristance with out disconncting earth lead & both sides of cable ends? If not, any other method to measure ER & CIR with out disconneting from the system.
What the difference between three phase contactor (coil 110vac) & three phase SSR (control voltage 110Vac)? May I use contactor in place of SSR?
how to calculate current and voltage in a same circuit?
what is transient stability analysis means?
what is the requirement regarding earthing of Single conductor with AWA
bitumar