Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?

Answer Posted / t.chandrasekar

the unit weight of cement is 1440kg/m3.
for 1 m3 of 1:1 cement mortor the reuirement of sand is 1m3
and cement will be 1part of sand that is 1 m3 thus weight
of cement required is 1x1440kg/m3=1440 kg.
for 1 m3 of 1:2 cement mortor the reuirement of sand is 1m3
and cement will be 1/2 part of sand that is 0.5 m3 thus
weight of cement required is 0.5x1440kg/m3=720 kg.
for 1 m3 of 1:4 cement mortor the reuirement of sand is 1m3
and cement will be 1/4 part of sand that is 0.25 m3 thus
weight of cement required is 0.25x1440kg/m3=360 kg.
for 1 m3 of 1:6 cement mortor the reuirement of sand is 1m3
and cement will be 1/6 of part sand that is 0.5 m3 thus
weight of cement required is 1/6x1440kg/m3=240 kg.

Is This Answer Correct ?    44 Yes 49 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Whats the meanig of ,'K' VALUE in the case of soil.....

2066


can you provide a link for manual design of building?

1612


what is flashing?

1220


What will you do if a portion of load bearing wall collapses under your supervision?

2046


Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

6562


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

2130


WHAT GOAL DO YOU HAVE IN YOUR CARRIER?

2482


sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.

2929


States some of the tool bars used in cad?

1269


how meny typs of renging rod?

2321


How to find CN by using arcgis 9.3?

2487


from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar

4701


within an emergency scenario what are the safe systems of work a coss can setup as part of is duties

2192


Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

11688


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1919