Answer Posted / azhagesan
which concrete we are using for proper level, under the
foundation that is lean concrete
Is This Answer Correct ? | 22 Yes | 6 No |
Post New Answer View All Answers
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
1:4:8 pcc calculation 591 cu.ft
Define What is made from large rocks, which protects the base of cliffs?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
How are freeway bridges built?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
What is quantity of cement and sand required for 2000sqft of tiling?
How will you reduce the concrete flow after mixing the concrete
how can we calculate steel value, depending on load
List out some of the common problems that architect have to tackle it?
What Are The Steps Involved In The Concreting Process, Explain?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
What is an ortho mode?
How to calculate paint drums per meter square
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation