what affect on the structure and related beam of slab when
provide one way slab insteade of two way slab
Answer Posted / praman
in case of one way slab,the 50% of total load act at one
longer side of beam & other side of beam is not considering
for any kind load.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
roll of DLC in road constructions
How to fix toll charge for a particular vehicle at toll booths in a highway?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
what is the effect of duration of earth quake on framed structures ?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
Which are the Steel tests ?
What in your past experience or education prepares you for the position for which you are applying
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
What do you mean by bond? What are the different types of bonds?
What do you understand by “preset” during the installation process of bridge bearings?
why +1 to be followed for calculating the no of bars in BBS. Please explain
Define current ucs?