what is difference of electrical and electronics
Answer Posted / shaliniselvi
we can say "electrical" instruments deal with 'Analog'
signals mostly defined by the equations of classical
physics. They certainly obey Ohm's Law. Term 'Electrical' is
associated with the typical conception of Electric Field(E)
which exerts electric Force(F) on a charge particle(q) and
it produces electricity, Where F=qE.
But 'Electronic' instruments are made to deal with 'Digital'
signals. Analog electrical signal is changed to Digital
signals ( 0, 1). They are semiconductors devices which never
obey Ohm's Law and implemented with logic gates.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
my b-tech percentage is 50%. what answer will satisfy the hr ?
how will we calculate the copper wire load..
What happen to the transformer if the OLTC frequently used for lower and raise occured 50times daily?
what is earthing.how we make it,describe briefly.
What is the difference between indoor and outdoor transformer
ult of expression 'document.FrmQF.myem
WHAT IS MOBILE SUB-STATION? & REALLY BENEFIT IN INDIA
How many double suspension hardware fittings are required on a double circuit transmission tower?
I WANT TO INSTALL LIGHTING ARRESTOR ABOVE 20 FEET HEIGHT INDUSTRIAL BUILDING. NOW IT WAS 15 FEET HEIGHT HOW MUCH DISTANCE IT WILL COVER & HOW TO CALCULAT THE DISTANCE COVER BY THE ARRESTOR
What is the function of auadag in a cro?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
Why have to use copper cable for local isolator to motor ?
What is the method for testing the differential protection stabilty in generator? When the time of starting What will happen if differentail protection connection wrong means?
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
can anyone send me some sample question regarding power grid corp