In your experience what is the maximum beam length. What's
beam size and also please provide column size also. Thanks.
Answer Posted / santosh singh
it depends on design & loading
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
sir how can we find the cement and sand required for making 4" drop
how much one carpenter can doing shuttering of slab in one day
whats is difference between anchorage length and development length
What are the different types of foundation?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
Types of column foundation and how to calculate its steel quantity.
how to calculate testing date
What things you need to take care of before building a kitchen island?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
Concrete cover for slab, column, beam and footing?
How did the romans get water up hills using aqua ducts?
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?