In your experience what is the maximum beam length. What's
beam size and also please provide column size also. Thanks.
Answer Posted / santosh singh
it depends on design & loading
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
on what basis the partial factor of safety are decided? form the load combinations
what is pqc
strength vs shape factor
brickwork labour rate per cum ?
how to conversation of all construction material in to brass
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
Where will be the maximum bending moment in a TEE Beam?
how much shouid be the rate for ready mix concrete per cubic meter
In reclamation works what are the importance of geotextiles and sand?
What is the distance between railway tracks?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
Why the finite element method is lower bound solution?
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.