Why is cover provided in beams, slabs, lintels, columns, etc ? What is the drawback of not providing cover in the same?
Answer Posted / qamar
Cover provides fire resistance to the concrete.
| Is This Answer Correct ? | 2 Yes | 6 No |
Post New Answer View All Answers
what is tension & compression of steel bending.
What is the tensile strength of marble?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
what is the minimum cement content for M20 & M25 as per is code -456(2000).
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
what else we can add rather than admixture in concrete to reduce the cement quantity?
How many lbs are there in a yard?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
how to calculate mivan shuttering matrial
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?