hi frienda We have 250kva cater pillet dg set we are fasing
one diffrent proublam in dg we are start dg set after one
mint applying load around 450a load but dg was run 3 Or 4
mints after 3 mints dg was shuding down automatic how to
face this proublam pls tel any budy
Answer Posted / abdulgafar
A full load current of 250KVA DG Set is approximatly 350A.
Most of the DG Sets are designed to catter approximatly 10%
over load For a period of one hour hence a 250KVA dg set
can catter 385A For a period of one hour. you have applied
more load then the DG Set can catter/ deliver hence your DG
Set is triping automatically after about 3 min. hope i have
answered your question.
AGM
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
WHAT IS THE PARTIAL DISCHARGE TEST?
Pls explan the OLR setting in VCB at HT yard
Why a tesa lamp is glow between two phase?
why incomer bay is required before transformer bay if there are more than 1 nos. of transformer bay.
Why the output of OP-AMP is always less than Vcc?
What is the difference between Droop vs Isoch Control?
What kind of socket shall be provided for window type air conditioner with cooling capacity upto 18000 BTU/hr
What is error of a measurement?
How will you define capacitance?
If I want to connect a capacitor bank on the HT side of a 11kV/415V, 3 phase delta-star distribution transformer to supply Reactive power to it..what practical specifications of a Capacitor bank that can i've??please reply..
how to choose cable size with respect to load? how to convert cable size in mm2 to sq.mm?
why ahould you show client/engineer activities clearly on the project plan
Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.
what ispositive, negative, zero sequence impedence?
where solid grounding and where grounding through ngr done and why?