hi frienda We have 250kva cater pillet dg set we are fasing
one diffrent proublam in dg we are start dg set after one
mint applying load around 450a load but dg was run 3 Or 4
mints after 3 mints dg was shuding down automatic how to
face this proublam pls tel any budy
Answer Posted / abdulgafar
A full load current of 250KVA DG Set is approximatly 350A.
Most of the DG Sets are designed to catter approximatly 10%
over load For a period of one hour hence a 250KVA dg set
can catter 385A For a period of one hour. you have applied
more load then the DG Set can catter/ deliver hence your DG
Set is triping automatically after about 3 min. hope i have
answered your question.
AGM
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is the difference b/w ground & virtual ground?
i need about 10 years of GATE solved papers in pdf format and even mock tests toooo
What are the advantages and disadvantages of closed-loop control system?
What is resolution of a measurement?
Factory acceptance test. FAT. For 132 kv transmisstion towers what is that meaning and what are the tests commonly companies perform now days.
What are the factor to be consider for CT selection in 132kV substation?
what is the difference between changer, converter and transformer?
how we can decide that what value of ht line will come to any commercial building? (ans except According to the building load)
how many types control panel of a 132/33 kv substation
What happens to a motor if it is connected in Delta connection
DIFFERENCE BETWEEN NORMAL TRAFO AND THRISTER TRAFO?
What will be advantage if we put some load in neutral of grounded star transformer & loadshortcircuit current,rated current of cable & MCB with example?
what is the value of combined earthing in general electrical circiut?
hi, i have 3x200KVA and 2 x 80KVA UPS with battery bank of 150AH 68Nos. and 100AH 204Nos., i need to install AC either ductable or PAC type, so can you help me to calculate heat load and capacity of the AC to install.
what is your aim