Answer Posted / deepak
the elevation given in the simple curve in the roads to
avoid the overturn of the vehicals.
| Is This Answer Correct ? | 23 Yes | 1 No |
Post New Answer View All Answers
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
What is the development length given in pile?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
I need model question papers for writing the Dubai municipality exam,for G+1
What are the causes of building collapse?
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
How do You Maintain a structure after getting cube test of low strength.
How do you calculate reinforcement weight of steel?
How much is the cover for slab?
why the openings of sieves are square io size?
What are moment of inertia and its importance in civil engineering?
What are some facts about concrete?
Why should you show Client/Engineer activities clearly on the project plan?