can we half project in parallel jobs and half project in
server jobs?
Answer Posted / n
No
| Is This Answer Correct ? | 2 Yes | 9 No |
Post New Answer View All Answers
Hi All , in PX Job I have passed 4 Parameters and when i run the same job in sequence i dont want to use those parameters , is this possible if yes then how
i have a job with 3 possibiliies finish with ststus ok abbort warning how do you handle these 3 in job sequence? explain the situation where you have appiled scd in your project? chandu
What is the difference between the local container and shared container?
What is the difference between orabulk and bcp stages?
sed,awk,head
How to create a file using vi editor? 2)how to delete a file in vi editor? 3)How to connect the server datastage to unix? what r the command lines we r using? 4)30 jobs r runnig in unix i want to find out my job. how to do this? give me command?
if we using two sources having same meta data and how to check the data in two sources is same or not? and if the data is not same i want to abort the job ?how we can do this?
Differentiate between odbc and drs stage?
What is a quality stage in datastage tool?
What is the sortmerge collector?
Can you implement SCD2 using join, transformer and funnel stage?
If you want to use the same piece of code in different jobs, how will you achieve it?
Define project in datastage?
Define Job control?
how to run a sequential file stage in parallel if the stage is used on the TARGET side