Why is cover provided in beams, slabs, lintels, columns, etc ? What is the drawback of not providing cover in the same?
Answer Posted / arun kumar sharma
cover is provide because the steel get croded due to
atmospic conditions and it get rusted thats why steel is
provided
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
yasser arfatcompleted his degree in civil from which university
what is your role of in previous company as a construction manager
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
The 4 main factors to start a construction project are––
what is civil all interview questions
How much does the leaning tower of pisa lean?
What is the basic difference between OPC
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
Define What glue is least sticky?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
What is geopolymer based concrete?