Could anybody tell me types of testing involved when the
project is at maintenance.

Answer Posted / dinesh

It depends.
If there is any change required from the customer end then
we need to do CR(change request) verification.
If there is any post release defect then we need to
reproduce the issue and later when the issues is fixed we
need to do fix verification and regression.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between preventative and reactive approaches to testing?

611


Explain test bed?

542


HI friends, I am planning to take up foundation level ISTQB Certification exam in March. Anybody having the study materials and sample papers please mail sunkumaranr@gmail.com Thanks in Advance...

1629


What is the difference between test scenarios and test strategy?

561


what are the daily activities of a software tester ie the activities carried out by the tester from the time he/she enters the office till the time he/she leaves the office

6059






What is life cycle?

552


Explain system testing?

609


Hi,can anyone help me with sap testing.how is sap testing done

1601


Hi Guy's Pls. go to Forum of Allinterview.com for Testing Job Openings..You can find various job openings in Forum. You can submit ur resume too

1607


What are validation and verification?

629


Hello, I would like to know which all versions of Testing tools (load runner, winrunner, qtp, test director) are no longer used and which versions of these which are being used?

2133


What version of the oracle are you familiar with?

637


Mention what bottom-up testing is?

600


Which technique can be used to achieve input and output coverage? It can be applied to human input, input via interfaces to a system, or interface parameters in integration testing.

800


What is software verification?

592