Answer Posted / srinivas
In star delta starter first star contactor will be in action after some delay time delta contactor will come in to picture and no need of time delay for star contactor.
At the time of starting motor ohmic resistance is zero and hence the back EMF zero. So it will takes more current, it may cause winding damage. So we have to reduce the starting currents. it is possible by connecting the motor terminals as star at the starting. Time delay range depends on what type of load used in motor and rating of motor. Normally the time delay range will set to reach above 70% of the motor load.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How energy is generated in hydroelectric power plant?
From past few months I am getting lagging pf even though sufficient capacitors used in circuit. Where is the problem pls answer
what is a types of short circuit and what is a types of distance protection tests
Explain what are inter-poles and why they are required in a dc machine.
For group 1 , 2 whather i have to prepare my technical or general studies etc? and im graduate in ee engg. for wht posts im eligible for? please tell me!
R=*ΒΆ l/a
what is RFID? thire application;
What is dc current source? Differentiate between ideal and non ideal current sources?
What is the function of interposing current transformer?
An active element is one which a. Supplies energy b. Absorbs energy c. Supplies energy and convert energy from one form to another
What is the current carrying capacity of 35sq.mm flexible cable?
define the active power?
we are small scale industry in production of rice & rice bran. Pls let me know how to take contract demand for our industry.. (for information we have total 600.hp)
Proviiding the Dedicated N earth and individual Body Earths ,Finally these all looped /Now my Question :- will it not harm in case of Transformer Fault current flows in Dediacted N Earthing to Looped Body Earthing.
how generator load test is conducted?what are the steps?