Answer Posted / sj1234
Quality control describes the directed use of testing to
measure the achievement of a specified standard. Quality
control is a formal (as in structured, not as in wearing-a-
tuxedo fancy) use of testing. Quality control is a superset
of testing, although it often used synonymously with
testing. Roughly, you test to see if something is broken,
and with quality control you set limits that say, in
effect, if this particular stuff is broken then whatever
you're testing fails.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is meant by Factory testing?? I have seen this one in a Job posting
How frequently is your project audited? How do you know the result of these audits?
wht type of intersting things sqa have or what is intersting abt sqa and how it will be advanategous for us as a sqa engineer?
What is difference between qa, qc and software testing?
How to estimate testing effort ?
Do anybody have any idea about the testing tools related to client-server apllications( for banking application or products ).Kindly tell me both open source and licensed tools. Thanks in advanceRegards
What is exploratory testing and specification-driven testing?
pls post the questions for qa position in factset
draft an email to the client asking for clarrification on the conference calling function in a landline phone
can u share your though about test leakage matrix with template?
how to identify metrics, integrity level, identify risks and identify security issues in ieee 829 standard explain with examples??
What is the Differnce B/W Quality Management and Quality Control
Explain the process of qa testing?
What kinds of performance tests might be required for a word processing system?
What are the key components of a test case template