how to crack cts interview apps?
NOVEMBER 21 2010
Answer Posted / sharathyadhav
just read the following books and chapters u will surely
get thru
RS AGARWAL VERBAL AND NON RESONING
CHAPTERS:
LOGIC-PAGES(SECTION2>LOGIC>1-42):SYGOLISM(ALL DOGS ARE
ANIMALS,ALL FISH ARE ANIMALS,JUST GO THRU THE CONCEPT USING
VENN DIAGRAM WITH THIS U WILL BE ABLE TO ATTEND 2 TO 3
QUESTIONS
DECODING TECHNIQUE JUST HAVE A GLANCE OF ALL SUMS HOW THEY
PERFORM
DIRECTIONS
COMMON ENGLISH TEST WHETHER THE LINE IS CORRECT OR INCORRECT
2 BIG PARAGRAPH ALWAYS MAKE SURE U DO THIS AT LAST OR U
WILL WASTE TIME
TIPS:READ THE QUESTIONS AND HAVE IT I MIND THEN READ THE
PARA SO U WILL MAKE IT CORRECT
TRY TO READ AGE SUMS AND RACE AND AVERAGE
THEN COMMON ONE "FIND THE NEXT FIG"
WITH THIS IF U ARE SURE THEN U ARE IN FOR APPS FOR CTS
| Is This Answer Correct ? | 12 Yes | 1 No |
Post New Answer View All Answers
Define static linking and dynamic linking.
Program A (Normal COBBAT) calling a B Program (DB2COBOL, COBBATDB which is using a VSAM file. its a dynamic call. How we will handle VSAM file decleration in our from JCL from where we are running A PGM. And should we have PLAN for A pGM also. if possible can some one post a sample JCL. Thanks for help in advance.
Difference between array and sub-script ?
how to move the records from file to array table. give with code example
How to fetch 1000 error records from VSAM file(Eg: 1000000 records present) while getting SOC7 abend ?
I have a File that has duplicate records. I need only those records that occur more than thrice.?
What are the different rules of SORT operation?
)If there are 10 steps in GDG, if I want to refer the step2 after step5 . what should I do?
What is the difference between structured cobol programming and object alternativelyiented cobol?
How do define dynamic array in cobol.
1.Is it possible to move the data from 99.99 to 99v99? 2.What is the CICS-vsam Compilation process? 3.In My GDG 5 generation will be there GDG3 got an abend what will happen? 4.In my GDG first generation is +1 And I want to add the new generation what will happen previous generation? 5.How can you give the PIC clause below conditions A). s9 (reddy), B). s9 (5) occurs 5 times? 6.How override the proc from a particular step? and what is symbolic and override Procs?
How to know whether the module is dynamical or statistical?
i want to learn mainframe..any websites and material to learn from basic..? my mail id : rajeswaribe2010@gmail.com
Write some characteristics of cobol as means of business language.
Name the sections present in data division.