what is mapping in instrumentation and control engineering
Answer Posted / fulbert
Mapping is either called I/O Mapping for configuring
Input/Output addresses between the devices in a control
system network.
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
in mass flow meter what is drive friquancy ?
how many pulses are required by a ac induction servo motor of 4 poles with 50 Hz frequency to rotate by 1 degree?
where i can get training in INTOOLS and PDMS in Delhi-NCR OR north part of India. please reply with ur ans. at arunsamkaria@ymail.com
Specify ideal accuracy of flow element like orifice plate, Ventury, Annubar. Ultrasonic flow meter etc.
In a gas over oil actuator, after the opening/closing of valve, how the gas is vented out? How does the hydraulic/gas circuit function?
need instrumentation job completed 1 year trainee ship in mnc pesticide company. now in search of job
How will you calibrate an Absolute Pr.Transmitter of range 400mmHg absolute ?
What are different types of control valves?
What is surge and how is it prevented, what is the purpose of bypass valve across AS valve.
How to calibrate radar type level transmitter for interface level? Total liquid(liq.1 and liq.2), level both the liq individually? For. Both the liquid levels how the signal will go from transmitter to dcs? How to calibrate. Single radar 9:26:55 AM for 2 different liquids in a tank?
key exchanges in wpa,wpa2,tls
tell me the field & lab calibration procedure step by step with diagram of pressure gauge, pressure switch, pressure transmitter, temperature switch, level switch, flow switch, flow transmitter, temperature transmitter, temperature indicator, flow indicator, level indicator, control valve, thermocouple, pressure indicator (digital & analogue),
Programmable Logic control.
why any measurement made interms of pressure is more accurate ? to be more precise most of the flow velocity is made interms of pressure and it is accurate. what is the reason behind pressure measurement being accurate ?
who's take first position in process in the timing of new installation flow transmitter and control vavle. give the answer with logical trick.