Dear I would like discuss in deep beams problem in design
and serviceability. please contribute to prepare a
comprehensive discussion. first deep beam definition:
Answer Posted / mmh356
Because the geometry of deep beams, their behavior is
different with shallow beams especially they behave as two-
dimensional action rather than one-dimensional action. The
assumption of plane section remain plane cannot be used in
the deep beam design and the shear deformation cannot be
neglected as in the ordinary beam. Thus the load path for a
point load applied at the top of a deep beam will follow a
rather direct path from the loading point toward the points
of support, which appears to depart fairly from that of a
typical bending behaviour for a point load applied at the
top of a shallow concrete member.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
What is modular elasticity?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
what is right & short method of measurement of slab&beam
What are the applications of modulus of elasticity?
can you give me the details of rate analysis of steel and concrete?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
Define Workability ?
How are freeway bridges built?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
Formula of mid span bar
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...