Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate cement required for m20,m5 grade

Answer Posted / amey pathak

for M20 grade ratio is (1:1.5:3)
we consider for 10m3
add 50% for shrinkage & wastage
then it is 10+5=15m3
cement= 15/1+1.5+3 *1
= 2.72m3
for no. of cement bags = 2.72/0.0347
= 78.38 no.
= 79bags for(10m3)
so that for 1 m3 it is around 8 bags..........

Is This Answer Correct ?    61 Yes 16 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

2032


A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx

1822


What is the tensile strength of marble?

1180


Spider cracks occur in beam bottom due to––

2142


what is the effect of duration of earth quake on framed structures ?

2266


During reclamation how can the occurrence of mud waves can be rectified?

1323


Formula of area of crane hook

2029


Calculation of curtain wall of box culvert

6112


What is the development length given in pile?

3228


mix design procedure for 1:6 cement mortar

2244


What are the Types Of DPC and its Thickness used?

1444


a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula

1693


when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?

2168


Dear Sir What is the Contraction joint for base Slab

2135


I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help

2820